Re-waterproof refurbish bathroom bathroom HDB HIP Professional
This re-waterproofing as well as enhancements to the bath/toilet is a HDB program.
Prior to the hacking functions, the service provider installed PVC sheets that extends from ceiling to flooring. This was to have as well as restrict the dirt to within the job area.
Amazingly, when hacking began, with the ever before existence of a wind, dirt got on both sides of the PVC dirt obstacle!
Well, reached obtain made use of to it over the complying with 10 days.