Remodelling Trip component 1 | HDB BTO 4 space | Household of 5



HDB BTO 4 space level.
Recording my restoration trip.
Collaborating with specialist Sheng Da Remodelling Layout as well as taping the timeline.
Keys gathered on 25 April 2022 as well as entire restoration requires to finish for relocate by 25 May.
Extremely very little woodworking preparation, presently just prepared for base kitchen area.
Relocating with 3 youngsters while husband is abroad.
Flooring location 94m2 (inclusive of Interior flooring location of 90m2 as well as A/C step)

absolutely nothing is being funded in this video clip